Yayın:
Causal Relationships of Readability Risks in Construction Contracts

dc.contributor.authorKoc, Kerim
dc.contributor.authorGurgun, Asli Pelin
dc.date.accessioned2026-06-27T14:39:55Z
dc.date.issued2022
dc.description.abstractIssues related to readability risks in contracts could exacerbate conflict, claim and dispute occurrences in construction projects. Determination of root causes of readability risks by defining casual relationships in construction contracts is essential to improve contract documentation and enable successful risk management. This paper aims to differentiate net causes from net effect factors of readability risks in construction contracts. Most significant readability risks in construction contracts were analyzed using fuzzy decision-making trial and evaluation laboratory (DEMATEL) method, which is known for its wide implementation in similar problems. Root cause degree (RCD) diagram was drawn to illustrate the differentiation of these factors by adopting maximum mean de-entropy (MMDE) algorithm. Analysis results indicated that poor grammar use, legal terminology, visual representation, and negative language were the major underlying cause factors; while lengthy document, use of abbreviations, scope complexity, controversial uses, repetitions, and ambiguous words were the net effect factors. The results are expected to improve readability of contract documents, which would contribute to more effective risk management and better allocation of project resources.en
dc.description.urihttps://doi.org/10.18400/tekderg.962928
dc.identifier.doi10.18400/tekderg.962928
dc.identifier.endpage11846
dc.identifier.issn1300-3453
dc.identifier.issue2
dc.identifier.startpage11823
dc.identifier.urihttps://hdl.handle.net/20.500.14981/63269
dc.identifier.volume33
dc.identifier.wos000864013400011
dc.language.isoeng
dc.publisherTURKISH CHAMBER CIVIL ENGINEERS
dc.relation.ispartofTEKNIK DERGI
dc.rightsopenAccess
dc.subjectConstruction projects
dc.subjectcontract readability
dc.subjectcontract drafting
dc.subjectconstruction conflicts
dc.subjectrisk management
dc.subjectDEMATEL METHOD
dc.subjectINDUSTRY
dc.subjectIDENTIFICATION
dc.subjectDESIGN
dc.subjectMODEL
dc.subjectEngineering
dc.titleCausal Relationships of Readability Risks in Construction Contracts
dc.typeArticle
dspace.entity.typePublication
local.import.sourceWOS

Dosyalar

Koleksiyonlar