Yayın:
Investigation of dispute factors and effects on construction projects arising from COVID-19 pandemic as a force majeure event

Yükleniyor...
Küçük Resim

Tarih

Kurum Yazarları

Danışman

item.page.editor

Editör

Bölüm / Program

Dergi Başlığı

Dergi ISSN

Cilt Başlığı

Yayıncı

GAZI UNIV, FAC ENGINEERING ARCHITECTURE

DOI

10.17341/gazimmfd.784968

Türü

View PlumX Details

Araştırma Projeleri

Akademik Birimler

Dergi Sayısı

Özet

The Covid-19 pandemic has shown its effects not only in public health and economy but also in numerous industries including construction industry. In this sense, construction companies might face serious troubles such as disruptions in production activities in the supply chain, deterioration in cash flow, non-fulfillment of contract obligations due to Covid-19. Therefore, this study aims to investigate the effects of Covid-19 on the Turkish construction projects in terms of contractual relations between the parties of construction projects. Within this aim, data were gathered from 173 construction projects and then analyzed with Structural Equation Modeling (SEM) method. Results of the SEM analysis show that key dispute factors are progress payments, failure in claim notifications of contractors within the relevant period following the occurrence of pandemic in written form and failure in implementing quality monitoring and control processes due to lack of personnel with the highest factor loadings in their clusters.

Tanım

Dergi veya Seri

JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY

ISSN

1300-1884

ISBN

Alıntı

Koleksiyonlar

Onay

Gözden geçir

Tamamlayıcı Bilgiler

Referans Gösteren

Related Patent

Related Goal

0

Views

0

Downloads