Yayın:
Ship Repair and Maintenance Management: Application of PERT Analysis on a Tanker Vessel

dc.contributor.authorTuran, Eda
dc.contributor.authorAsar, Ridvan
dc.date.accessioned2026-06-27T14:24:54Z
dc.date.issued2020
dc.description.abstractThe costs in shipbuilding and ship repair and maintenance activities are massive and need several materials in the same production phase. Construction without planning is not rational, and any mistake in the planning phase will cause major loss of time, quality, and financial resources. Planning in ship repair and maintenance yards is more complicated than new building shipyards because the duration time is limited. In this study, 200-m-long tanker's repair and maintenance period has been planned by program evaluation and review technique analysis in light of the data acquired from X shipyard in Turkey to reflect critical activities that affect the total duration time.en
dc.description.urihttps://doi.org/10.5957/jspd.07190044
dc.identifier.doi10.5957/jspd.07190044
dc.identifier.eissn2158-2874
dc.identifier.endpage188
dc.identifier.issn2158-2866
dc.identifier.issue3
dc.identifier.startpage181
dc.identifier.urihttps://hdl.handle.net/20.500.14981/60355
dc.identifier.volume36
dc.identifier.wos000589180800003
dc.language.isoeng
dc.publisherSOC NAVAL ARCHITECTS & MARINE ENGINEERS
dc.relation.ispartofJOURNAL OF SHIP PRODUCTION AND DESIGN
dc.subjectshipyard
dc.subjectrepair
dc.subjectmaintenance
dc.subjectplanning
dc.subjectPERT
dc.subjectEngineering
dc.titleShip Repair and Maintenance Management: Application of PERT Analysis on a Tanker Vessel
dc.typeArticle
dspace.entity.typePublication
local.import.sourceWOS

Dosyalar

Koleksiyonlar