Yayın:
Optimal Bidding Strategy Considering Bilevel Approach and Multistage Process for a Renewable Energy Portfolio Manager Managing RESs With ESS

dc.contributor.authorCicek, Alper
dc.contributor.authorErdinc, Ozan
dc.date.accessioned2026-06-27T14:35:49Z
dc.date.issued2022
dc.description.abstractThis article presents a bilevel and multistage framework in which a renewable energy portfolio manager (REPM) manages renewable energy sources (RESs) integrated with an energy storage system (ESS) to reduce imbalances and joins in the day-ahead market and the balancing market, including bilateral contracts. The total REPM gain is maximized in the upper level, whereas the loss of income of each portfolio participant in the lower level is minimized taking into account the specified income value. In the multistage structure, different decisions are taken regarding energy trade according to the hours of the day. Generations and price uncertainties that need to be addressed in optimum bidding problems are eliminated with a stochastic approach. Besides, risk management is evaluated through the conditional value-at-risk method. Besides, the test is carried out using real data from Spain in order to verify the effectiveness of the proposed model. According to the results obtained from the study, it can be stated that RESs with ESS increase the portfolio profit by 2%, and even in the case of expected generation, it is 4.1%, by better managing the energy imbalance of participants.en
dc.description.sponsorshipTurkish Science Academy (TUBA) under the Distinguished Young Scientist Programme (GEBIP)
dc.description.urihttps://doi.org/10.1109/jsyst.2021.3131138
dc.identifier.doi10.1109/jsyst.2021.3131138
dc.identifier.eissn1937-9234
dc.identifier.endpage6073
dc.identifier.issn1932-8184
dc.identifier.issue4
dc.identifier.startpage6062
dc.identifier.urihttps://hdl.handle.net/20.500.14981/62486
dc.identifier.volume16
dc.identifier.wos000734083700001
dc.language.isoeng
dc.publisherIEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
dc.relation.ispartofIEEE SYSTEMS JOURNAL
dc.subjectOptimization
dc.subjectUncertainty
dc.subjectPortfolios
dc.subjectRenewable energy sources
dc.subjectStochastic processes
dc.subjectElectricity supply industry
dc.subjectContracts
dc.subjectBilevel optimization
dc.subjectenergy storage systems (ESSs)
dc.subjectmultistage process
dc.subjectoptimal electricity market parti-cipation
dc.subjectrenewable energy portfolio manager (REPM)
dc.subjectWIND FARMS
dc.subjectOPERATION
dc.subjectSYSTEMS
dc.subjectMARKETS
dc.subjectComputer Science
dc.subjectEngineering
dc.subjectOperations Research & Management Science
dc.subjectTelecommunications
dc.titleOptimal Bidding Strategy Considering Bilevel Approach and Multistage Process for a Renewable Energy Portfolio Manager Managing RESs With ESS
dc.typeArticle
dspace.entity.typePublication
local.import.sourceWOS

Dosyalar

Koleksiyonlar