Yayın:
Cost evaluation of two potential nuclear power plants for hydrogen production

dc.contributor.authorSorgulu, F.
dc.contributor.authorDincer, I.
dc.date.accessioned2026-06-27T14:15:23Z
dc.date.issued2018
dc.description.abstractHydrogen is recognized as one of the most promising alternative fuels to meet the energy demand for the future by providing a carbon-free solution. In regards to hydrogen production, there has been increasing interest to develop, innovate and commercialize more efficient, effective and economic methods, systems and applications. Nuclear based hydrogen production options through electrolysis and thermochemical cycles appear to be potentially attractive and sustainable for the expanding hydrogen sector. In the current study, two potential nuclear power plants, which are planned to be built in Akkuyu and Sinop in Turkey, are evaluated for hydrogen production scenarios and cost aspects. These two plants will employ the pressurized water reactors with the electricity production capacities of 4800 MW (consisting of 4 units of 1200 MW) for Akkuyu nuclear power plant and 4480 MW (consisting of 4 units of 1120 MW) for Sinop nuclear power plant. Each of these plants are expected to cost about 20 billion US dollars. In the present study, these two plants are considered for hydrogen production and their cost evaluations by employing the special software entitled Hydrogen Economic Evaluation Program (HEEP) developed by International Atomic Energy Agency (IAEA) which includes numerous options for hydrogen generation, storage and transportation. The costs of capital, fuel, electricity, decommissioning and consumables are calculated and evaluated in detail for hydrogen generation, storage and transportation in Turkey. The results show that the amount of hydrogen cost varies from 3.18 $/kg H-2 to 6.17 $/kg H-2. (C) 2017 Hydrogen Energy Publications LLC. Published by Elsevier Ltd. All rights reserved.en
dc.description.urihttps://doi.org/10.1016/j.ijhydene.2017.10.165
dc.identifier.doi10.1016/j.ijhydene.2017.10.165
dc.identifier.eissn1879-3487
dc.identifier.endpage10529
dc.identifier.issn0360-3199
dc.identifier.issue23
dc.identifier.startpage10522
dc.identifier.urihttps://hdl.handle.net/20.500.14981/58519
dc.identifier.volume43
dc.identifier.wos000436225600002
dc.language.isoeng
dc.publisherPERGAMON-ELSEVIER SCIENCE LTD
dc.relation.ispartofINTERNATIONAL JOURNAL OF HYDROGEN ENERGY
dc.subjectCost evaluation
dc.subjectHEEP
dc.subjectHydrogen production
dc.subjectHydrogen storage
dc.subjectHydrogen transportation
dc.subjectNuclear power plant
dc.subjectChemistry
dc.subjectElectrochemistry
dc.subjectEnergy & Fuels
dc.titleCost evaluation of two potential nuclear power plants for hydrogen production
dc.typeArticle
dspace.entity.typePublication
local.import.sourceWOS

Dosyalar