Publication:
Integer and constraint programming models for the straight and U-shaped assembly line balancing with hierarchical worker assignment problem

dc.contributor.authorIsik, Eyuep Ensar
dc.contributor.authorYildiz, Seyda Topaloglu
dc.date.accessioned2026-06-27T14:54:52Z
dc.date.issued2024
dc.description.abstractThe solution to the assembly line balancing with the hierarchical worker assignment problem (ALBHWP) provides the optimal allocation of workers and tasks to the stations that minimise the total worker cost. In the ALBHWP, tasks differ in terms of the qualification requirements of workers, and the qualification levels of workers are hierarchical. In the hierarchical workforce structure, a lower qualified worker can be replaced by higher qualified ones with higher costs, while the vice versa is not applicable. This problem has only been studied for straight assembly lines so far. In this paper, we introduce the ALBHWP for U-shaped assembly lines. We developed integer and constraint programming models for solving the ALBHWP and compared their effectiveness using an extensive set of benchmark instances. We solved the ALBHWP for straight and U-shaped assembly lines comparatively. Constraint programming models have been statistically proven to provide better quality solutions faster than integer programming models. Besides, the CP model outperforms the only available metaheuristic in the literature for the S-ALBHWP in almost all problem sizes. Another observation is that a U-shaped line design is more cost-effective than a straight line design, but solving the ALBHWP for U-shaped lines is more difficult regarding computational complexity.en
dc.description.urihttps://doi.org/10.1080/00207543.2023.2290699
dc.identifier.doi10.1080/00207543.2023.2290699
dc.identifier.eissn1366-588X
dc.identifier.endpage5292
dc.identifier.issn0020-7543
dc.identifier.issue14
dc.identifier.startpage5269
dc.identifier.urihttps://hdl.handle.net/20.500.14981/66148
dc.identifier.volume62
dc.identifier.wos001122570800001
dc.language.isoeng
dc.publisherTAYLOR & FRANCIS LTD
dc.relation.ispartofINTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
dc.subjectU-shaped assembly line balancing problem
dc.subjectstraight assembly line
dc.subjecthierarchical workforce
dc.subjectinteger linear programming
dc.subjectconstraint programming
dc.subjectSEARCH ALGORITHM
dc.subjectBOUND ALGORITHM
dc.subjectOPTIMIZATION
dc.subjectCENTERS
dc.subjectEngineering
dc.subjectOperations Research & Management Science
dc.titleInteger and constraint programming models for the straight and U-shaped assembly line balancing with hierarchical worker assignment problem
dc.typeArticle
dspace.entity.typePublication
local.import.sourceWOS

Files

Collections