Yayın:
Development of a conceptual life cycle performance measurement system for build-operate-transfer (BOT) projects

dc.contributor.authorOkudan, Ozan
dc.contributor.authorBudayan, Cenk
dc.contributor.authorDikmen, Irem
dc.date.accessioned2026-06-27T14:25:58Z
dc.date.issued2021
dc.description.abstractPurpose The purpose of this paper is to develop a new conceptual life cycle performance measurement system (PMS) based on stage level key performance indicators (KPIs) to measure the performance of build-operate-transfer (BOT) projects. Design/methodology/approach This study uses a literature review to reveal the deficiencies of existing PMSs for public-private partnership (PPP) projects. Based on these deficiencies, four recommendations were proposed for developing a PMS. The validation of these recommendations was performed via focus group discussion sessions conducted with 12 experts. Then, a conceptual framework was developed based on the validated recommendations and the additional recommendations emerged during focus group discussions. Finally, the recommendations proposed by the focus group were tested by a questionnaire survey, the findings of the Friedman test and descriptive analysis validated these recommendations. Findings Findings of the focus group discussion, Friedman test and descriptive analysis indicated that the PMS should have four crucial features to develop an efficient, effective and comprehensible PMS for the BOT project. Firstly, non-financial and financial KPIs should be integrated. Secondly, the PMS should be developed as a process-based system with stage level KPIs. The performance of the BOT projects should be monitored and reviewed continuously, however the most important KPIs should be used for continuous performance measurement to increase the applicability of the system and allocate the resources more efficiently. Research limitations/implications This survey was conducted on experts who have experience with BOT projects located in Turkey, therefore, judgments of experts might be affected by external factors specific to Turkey such as geopolitical situations, investment environment. However, due to the nature of BOT projects, the experience of experts can also be utilized at the international level. Originality/value This is the first time a PMS has been developed to measure the performance of a BOT project. In addition, this system has unique features when compared with the PMS proposed in the literature. Especially, the stage level KPIs and continuous performance measurement with the most important KPIs throughout each stage has never been used. This research provides both public sector and private entities with an insight into effectively measure, control and manage their BOT infrastructure projects' performances throughout their life cycles.en
dc.description.urihttps://doi.org/10.1108/ecam-01-2020-0071
dc.identifier.doi10.1108/ecam-01-2020-0071
dc.identifier.eissn1365-232X
dc.identifier.endpage1656
dc.identifier.issn0969-9988
dc.identifier.issue6
dc.identifier.startpage1635
dc.identifier.urihttps://hdl.handle.net/20.500.14981/60563
dc.identifier.volume28
dc.identifier.wos000566030300001
dc.language.isoeng
dc.publisherEMERALD GROUP PUBLISHING LTD
dc.relation.ispartofENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT
dc.rightsopenAccess
dc.subjectPerformance measurement
dc.subjectBuild-operate-transfer
dc.subjectInfrastructure projects
dc.subjectPUBLIC-PRIVATE PARTNERSHIP
dc.subjectCRITICAL SUCCESS FACTORS
dc.subjectINDICATORS
dc.subjectMANAGEMENT
dc.subjectPPP
dc.subjectDESIGN
dc.subjectEngineering
dc.subjectBusiness & Economics
dc.titleDevelopment of a conceptual life cycle performance measurement system for build-operate-transfer (BOT) projects
dc.typeArticle
dspace.entity.typePublication
local.import.sourceWOS

Dosyalar

Koleksiyonlar