Yayın:
Suboptimal Solutions for Time Varying Time Delayed MPC Controllers

dc.contributor.authorMumcu, T. Veli
dc.contributor.authorGulez, K.
dc.date.accessioned2026-06-27T13:27:36Z
dc.date.issued2014
dc.description.abstractModel Predictive Control (MPC) with constraints is still an interesting subject and offers many problems to work on. This study basically aims to understand the optimization process and the decrease of convex quadratic costs in a single model predictive controller. For those processes where the system dynamics change so slowly it is essential to obtain the control law as soon as possible to minimize the time delay on the controller side. This study proposes an early termination of the optimization process and the suboptimal solution to the quadratic programming. To define the early termination in the following chapters it is discussed and explained when, where. The implementation of the strategy is also illustrated with a case study and it is compared to the LQR controller for the regulator problem.en
dc.description.sponsorshipYildiz Technical University Scientific Research Projects Coordination Department [2010-04-02-KAP05]
dc.description.urihttps://doi.org/10.5755/j01.eee.20.2.6378
dc.identifier.doi10.5755/j01.eee.20.2.6378
dc.identifier.endpage21
dc.identifier.issn1392-1215
dc.identifier.issue2
dc.identifier.startpage15
dc.identifier.urihttps://hdl.handle.net/20.500.14981/52820
dc.identifier.volume20
dc.identifier.wos000333396500003
dc.language.isoeng
dc.publisherKAUNAS UNIV TECHNOLOGY
dc.relation.ispartofELEKTRONIKA IR ELEKTROTECHNIKA
dc.rightsopenAccess
dc.subjectModel predictive control
dc.subjectMPC
dc.subjecttime varying time delay
dc.subjectquadratic programming
dc.subjectMODEL-PREDICTIVE CONTROL
dc.subjectSYSTEMS
dc.subjectEngineering
dc.titleSuboptimal Solutions for Time Varying Time Delayed MPC Controllers
dc.typeArticle
dspace.entity.typePublication
local.import.sourceWOS

Dosyalar

Koleksiyonlar