A MULTI-OBJECTIVE MODEL FOR TIME-COST-QUALITY-RISK TRADE-OFF PROBLEMS IN PROJECT MANAGEMENT

Loading...
Thumbnail Image

Date

Institution Authors

Unit of Researcher

Advisor

item.page.editor

Editor

Department

Journal Title

Journal ISSN

Volume Title

Publisher

UNIV CINCINNATI INDUSTRIAL ENGINEERING

DOI

10.23055/ijietap.2022.29.6.5785
View PlumX Details

Research Projects

Organizational Units

Journal Issue

Abstract

This study presents a weighted four-dimensional time-cost-quality-risk trade-off problem to assist decision-makers in planning the best possible use of resources. The proposed model aims to minimize time and cost while maximizing quality and safety and to ensure that the project is completed as required. The critical path method was used to calculate the completion time, the analytical hierarchy process method was used to determine the weights of the quality parameters, and the 3T risk assessment method was used to calculate the risk values. The algorithm was coded in GAMS and optimized using CPLEX. A construction project with a deadline of 310 days, a budget of 5,250,000 (sic), 88% quality and a safety index (SI) of 77% was selected to analyze the accuracy of the model. The model achieved a solution with a completion time of 310 days, costs amounting to 5,247,775 (sic), 88.036% quality, and 77.338% SI.

Description

Journal or Series

INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE

ISSN

1072-4761

ISBN

Rights

Citation

Collections

Endorsement

Review

Supplemented By

Referenced By

Related Patent

Related Goal

0

Views

0

Downloads