Yayın:
An occupational risk assessment approach for construction and operation period of wind turbines

dc.contributor.authorGul, M.
dc.contributor.authorGuneri, A. F.
dc.contributor.authorBaskan, M.
dc.date.accessioned2026-06-27T14:15:20Z
dc.date.issued2018
dc.description.abstractAs wind energy is one of the most important renewable energy sources over the globe, need for increasing safety for this type of energy is gaining importance. Although this sector is not suffering an excessive amount of fatal injury accidents, there are many aspects open for improvements in occupational health and safety management. The construction and operation processes of wind turbines include several hazards that must be reduced. This study aims to present a risk assessment for the construction and operation period of wind tribunes using a new fuzzy based method. Fuzzy analytical hierarchy process, a common used multi criteria decision making method, is applied to assign weights to the parameters of Fine-Kinney risk analysis method. Then, fuzzy VIKOR method is used to prioritize hazards. A case study is carried out for an onshore wind turbine in Turkey by using occupational health and safety experts in weighting risk parameters and evaluating compromised rankings of the hazards. Results reveal the most important hazards both for construction and operation period of the wind tribune. On conclusion of the current study, control measures for those risks and possible corrective-preventive actions for improvement are also provided.en
dc.description.urihttps://doi.org/10.22034/gjesm.2018.03.003
dc.identifier.doi10.22034/gjesm.2018.03.003
dc.identifier.endpage298
dc.identifier.issn2383-3572
dc.identifier.issue3
dc.identifier.startpage281
dc.identifier.urihttps://hdl.handle.net/20.500.14981/58508
dc.identifier.volume4
dc.identifier.wos000436375600003
dc.language.isoeng
dc.publisherIRAN SOLID WASTE ASSOC
dc.relation.ispartofGLOBAL JOURNAL OF ENVIRONMENTAL SCIENCE AND MANAGEMENT-GJESM
dc.subjectFine-Kinney method
dc.subjectFuzzy analytic hierarchy process (FAHP)
dc.subjectFuzzy VIKOR (FVIKOR)
dc.subjectMulti criteria decision making method (MCDM)
dc.subjectOccupational health and safety (OHS)
dc.subjectRisk assessment
dc.subjectWind tribune
dc.subjectSAFETY RISKS
dc.subjectFUZZY
dc.subjectMODEL
dc.subjectEXTENSIONS
dc.subjectSELECTION
dc.subjectHAZARDS
dc.subjectONSHORE
dc.subjectTOPSIS
dc.subjectVIKOR
dc.subjectFMEA
dc.subjectEnvironmental Sciences & Ecology
dc.titleAn occupational risk assessment approach for construction and operation period of wind turbines
dc.typeArticle
dspace.entity.typePublication
local.import.sourceWOS

Dosyalar

Koleksiyonlar