Yayın:
Constraint programming models for the hybrid flow shop scheduling problem and its extensions

Yükleniyor...
Küçük Resim

Tarih

Kurum Yazarları

Danışman

item.page.editor

Editör

Bölüm / Program

Dergi Başlığı

Dergi ISSN

Cilt Başlığı

Yayıncı

SPRINGER

DOI

10.1007/s00500-023-09086-9

Türü

View PlumX Details

Araştırma Projeleri

Akademik Birimler

Dergi Sayısı

Özet

Proper scheduling of jobs is essential for modern production systems to work effectively. The hybrid flow shop scheduling problem is a scheduling problem with many applications in the industry. The problem has also attracted much attention from researchers due to its complexity. This study addresses the hybrid flow shop scheduling problem (HFSP), which considers unrelated parallel machines at each stage and the machine eligibility constraints. HFSP is a well-known NP-hard problem with the aim of minimizing the makespan. Owing to the complexity of the problem, this study develops constraint programming (CP) models for the HFSP and its extensions: the no-wait HFSP, the blocking HFSP, the HFSP with sequence-dependent setup times, the no-wait HFSP with sequence-dependent setup times, and the blocking HFSP with sequence-dependent setup times. We also propose two mixed-integer linear programming models (MILP) for no-wait and blocking HSFPs with sequence-dependent setup times. The performances of the CP models were tested against their MILP counterparts using randomly generated instances and benchmark instances from the literature. The computational results indicated that the proposed CP model outperformed the best MILP solutions for benchmark instances. It is also more effective for finding high-quality solutions for larger problem instances.

Tanım

Dergi veya Seri

SOFT COMPUTING

ISSN

1432-7643

ISBN

Haklar

Alıntı

Koleksiyonlar

Onay

Gözden geçir

Tamamlayıcı Bilgiler

Referans Gösteren

Related Patent

Related Goal

0

Views

0

Downloads