Yayın:
IMPROVING THE OWNER-CONTRACTOR RELATIONSHIP THROUGH TRUST-BASED PREQUALIFICATION IN GREEN BUILDING PROJECTS

dc.contributor.authorGurgun, Asli Pelin
dc.contributor.authorKoc, Kerim
dc.contributor.authorDurdyev, Serdar
dc.date.accessioned2026-06-27T14:41:03Z
dc.date.issued2022
dc.description.abstractA competent contractor can be regarded as a catalyst to deliver a truly sustainable building and thus help to mitigate detrimental impacts to the built environment. The prequalification phase provides confidence to the owner to achieve a project's sustainability requirements and reinforcing a mutual relationship with the selected contractor. This study proposes a decision framework for green building (GB) prequalification, which aims to improve the owner/contractor relationship. A comprehensive literature review was conducted to identify prequalification factors. To draw attention to GB projects and trust-based prequalification factors, a focus group discussion was performed with GB experts. A decision framework consisting of 12 relationship-based factors was then subjected to a fuzzy decision-making trial and evaluation laboratory (F-DEMATEL) method. The followed methodology aided the determination of the relationship-based prequalification factors, specification of the importance of factor degrees, illustration of the interrelationship among factors and consequently reveal the most causal factors that might contribute significantly to the improvement of the owner and contractor (O&C) relationship in GB projects. Results pointed out the importance of financial factors, while the same factors were found to be the driving force behind the improved relationship between O&C. Pertinent literature on prequalification in GB projects are limited, and no prior indepth study has investigated the prequalification phase based on trust and the mutual relationship between O&C. Highlighting the gap in the literature about trust-based contractor selection models, the proposed study can be useful to minimize conflicts and claims between the O&C, which could positively influence direct owners to consider GB projects.en
dc.identifier.eissn1943-4618
dc.identifier.endpage231
dc.identifier.issn1552-6100
dc.identifier.issue2
dc.identifier.startpage211
dc.identifier.urihttps://hdl.handle.net/20.500.14981/63481
dc.identifier.volume17
dc.identifier.wos000817982200001
dc.language.isoeng
dc.publisherCOLLEGE PUBLISHING
dc.relation.ispartofJOURNAL OF GREEN BUILDING
dc.subjectcontractor prequalification
dc.subjectgreen building
dc.subjectrelationship
dc.subjectfuzzy DEMATEL
dc.subjectDECISION-MAKING MODEL
dc.subjectDEMATEL METHOD
dc.subjectCONSTRUCTION
dc.subjectBARRIERS
dc.subjectSELECTION
dc.subjectCRITERIA
dc.subjectIMPLEMENTATION
dc.subjectIDENTIFICATION
dc.subjectSUCCESS
dc.subjectArchitecture
dc.titleIMPROVING THE OWNER-CONTRACTOR RELATIONSHIP THROUGH TRUST-BASED PREQUALIFICATION IN GREEN BUILDING PROJECTS
dc.typeArticle
dspace.entity.typePublication
local.import.sourceWOS

Dosyalar

Koleksiyonlar