Yayın:
Approximate Estimation of Man-Day in Ship Block Production: A Two-Stage Stochastic Program

dc.contributor.authorGenc, Yusuf
dc.contributor.authorKafali, Mustafa
dc.contributor.authorCelebi, Ugur Bugra
dc.date.accessioned2026-06-27T15:06:30Z
dc.date.issued2024
dc.description.abstractIt is critical to estimate the workforce requirements for the production of blocks in shipbuilding. In this study, the number of workforce (man-day) required for the production of a passenger ship's double bottom block was estimated. Initially, the production of the block was observed, and the average working performance of the mounting, welding, and grinding workers was recorded. Block drawings were examined and the work required was calculated. The amount of work increased, depending on any revisions required due to incorrect or incomplete designs. The average working performance of an employee is uncertain due to environmental factors, including the weather and working conditions, as well as health (both physical and mental). A two-stage stochastic programming model with recourse was established to estimate man-day required and a Sample Average Approximation (SAA) technique was used to obtain a near-optimum solution. The results of the study were compared with shipyard records and an agreement of approximately 90% was achieved.en
dc.description.urihttps://doi.org/10.2478/pomr-2024-0015
dc.identifier.doi10.2478/pomr-2024-0015
dc.identifier.eissn2083-7429
dc.identifier.endpage158
dc.identifier.issn1233-2585
dc.identifier.issue1
dc.identifier.startpage146
dc.identifier.urihttps://hdl.handle.net/20.500.14981/68017
dc.identifier.volume31
dc.identifier.wos001193965300003
dc.language.isoeng
dc.publisherSCIENDO
dc.relation.ispartofPOLISH MARITIME RESEARCH
dc.rightsopenAccess
dc.subjectShipbuilding
dc.subjectBlock Production
dc.subjectPlanning
dc.subjectStochastic Modelling
dc.subjectPERFORMANCE EVALUATION
dc.subjectPRODUCTION LINE
dc.subjectMANAGEMENT
dc.subjectSIMULATION
dc.subjectDESIGN
dc.subjectSYSTEM
dc.subjectMODEL
dc.subjectEngineering
dc.titleApproximate Estimation of Man-Day in Ship Block Production: A Two-Stage Stochastic Program
dc.typeArticle
dspace.entity.typePublication
local.import.sourceWOS

Dosyalar

Koleksiyonlar