Yayın: A new approach for rebalancing of U-lines with stochastic task times using ant colony optimisation algorithm
| dc.contributor.author | Celik, Erkan | |
| dc.contributor.author | Kara, Yakup | |
| dc.contributor.author | Atasagun, Yakup | |
| dc.date.accessioned | 2026-06-27T13:30:26Z | |
| dc.date.issued | 2014 | |
| dc.description.abstract | In real world, line balancing involves existing lines in existing factories and the line typically needs to be rebalanced rather than balanced. Rebalancing of a U-line can be defined as a changeover process from its initial configuration to a new configuration for a while due to the reasons such as demand variations, changes in product design and changes in task times, etc. This study defines U-line rebalancing problem with stochastic task times and proposes a solution procedure based on ant colony optimisation. The objective of the proposed algorithm is to minimise total cost of rebalancing which is the sum of task transposition costs, workstation opening/closing costs and operating costs of workstations for a particular planning horizon. A comprehensive experiment is conducted to generate problem instances and to compare rebalancing costs of U-lines by means of several factors. A total of 6600 rebalancing solutions are obtained and several comparisons are performed. | en |
| dc.description.uri | https://doi.org/10.1080/00207543.2014.917768 | |
| dc.identifier.doi | 10.1080/00207543.2014.917768 | |
| dc.identifier.eissn | 1366-588X | |
| dc.identifier.endpage | 7275 | |
| dc.identifier.issn | 0020-7543 | |
| dc.identifier.issue | 24 | |
| dc.identifier.startpage | 7262 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.14981/53332 | |
| dc.identifier.volume | 52 | |
| dc.identifier.wos | 000345075300009 | |
| dc.language.iso | eng | |
| dc.publisher | TAYLOR & FRANCIS LTD | |
| dc.relation.ispartof | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH | |
| dc.subject | ant colony optimisation algorithm | |
| dc.subject | U-lines | |
| dc.subject | stochastic task times | |
| dc.subject | rebalancing | |
| dc.subject | MODEL ASSEMBLY LINES | |
| dc.subject | HEURISTIC ALGORITHM | |
| dc.subject | BALANCING PROBLEM | |
| dc.subject | Engineering | |
| dc.subject | Operations Research & Management Science | |
| dc.title | A new approach for rebalancing of U-lines with stochastic task times using ant colony optimisation algorithm | |
| dc.type | Article | |
| dspace.entity.type | Publication | |
| local.import.source | WOS |