Yayın:
Comparison of EDCs removal in full and pilot scale membrane bioreactor plants: Effect of flux rate on EDCs removal in short SRT

dc.contributor.authorKomesli, O. T.
dc.contributor.authorMuz, M.
dc.contributor.authorAk, M. S.
dc.contributor.authorBakirdere, S.
dc.contributor.authorGokcay, C. F.
dc.date.accessioned2026-06-27T14:07:27Z
dc.date.issued2017
dc.description.abstractCurrently, it is estimated that over 1 billion people are short of adequate portable water and this is expected to increase to 2.5 billion in the year 2025. Membrane Bioreactors (MBR) are now accepted as important tools to extend the availability of water by facilitating the reuse of wastewaters. Sludge Retention Time (SRT) and liquid flux rate are the two most important parameters for controlling the MBR process. In this study, the removal of selected endocrine disrupter compounds (EDCs), diltiazem, progesterone, estrone (E-1), carbamazepine (Cbz) and acetaminophen (Acet), by one full scale (VRM) and one pilot scale (clear-box) MBR plants was investigated. During the study, sludge age was set at 10 days and the sludge concentration was fixed at about 5.0 g/L. The transmembrane pressure (TMP) got higher with either increasing flux or sludge concentration in the membrane chamber. Therefore, changing the flux from 13 to 30 L/m(2)-h in both plants caused enhancement in TMP from -25 to -300 mbar in the clear box and from 160 to over 350 in the full scale MBRs. It was understood that flux had very little effect on the removal of EDCs at very low concentrations. Moreover, diltiazem was completely removed in the full scale whereas no removal was achieved in the pilot scale. Estrone and progesterone were completely removed by biodegradation in both plants. Acetaminophen was completely removed in the full scale plant whereas over 95% removal was achieved in the pilot scale MBR. (C) 2016 Elsevier Ltd. All rights reserved.en
dc.description.sponsorshipTUBITAK [1008Y272]
dc.description.urihttps://doi.org/10.1016/j.jenvman.2016.06.004
dc.identifier.doi10.1016/j.jenvman.2016.06.004
dc.identifier.eissn1095-8630
dc.identifier.endpage852
dc.identifier.issn0301-4797
dc.identifier.pubmed27324179
dc.identifier.startpage847
dc.identifier.urihttps://hdl.handle.net/20.500.14981/57293
dc.identifier.volume203
dc.identifier.wos000412621000031
dc.language.isoeng
dc.publisherACADEMIC PRESS LTD- ELSEVIER SCIENCE LTD
dc.relation.conference2015 International Conference on Industrial Waste and Wastewater Treatment and Valorisation
dc.relation.ispartofJOURNAL OF ENVIRONMENTAL MANAGEMENT
dc.subjectMembrane bioreactor
dc.subjectTransmembrane pressure
dc.subjectFlux
dc.subjectEndocrine disrupter compounds
dc.subjectSuction time
dc.subjectWASTE-WATER TREATMENT
dc.subjectENDOCRINE DISRUPTING COMPOUNDS
dc.subjectSEWAGE-TREATMENT PLANTS
dc.subjectPERSONAL CARE PRODUCTS
dc.subjectPHARMACEUTICAL RESIDUES
dc.subjectESTROGENIC CHEMICALS
dc.subjectSTW EFFLUENT
dc.subjectTRACE LEVELS
dc.subjectHORMONES
dc.subjectIDENTIFICATION
dc.subjectEnvironmental Sciences & Ecology
dc.titleComparison of EDCs removal in full and pilot scale membrane bioreactor plants: Effect of flux rate on EDCs removal in short SRT
dc.typeArticle; Proceedings Paper
dspace.entity.typePublication
local.import.sourceWOS

Dosyalar

Koleksiyonlar