MARMARAY BOSPHORUS CROSSING PROJECT: SURVEYING ACTIVITY AND GEODETIC MONITORING

Yükleniyor...
Küçük Resim

Tarih

Kurum Yazarları

Danışman

item.page.editor

Editör

Bölüm / Program

Dergi Başlığı

Dergi ISSN

Cilt Başlığı

Yayıncı

UNIV OSIJEK, TECH FAC

DOI

Türü

Araştırma Projeleri

Akademik Birimler

Dergi Sayısı

Özet

The ongoing Marmaray Project is one of the largest transportation infrastructure projects in the world. The total length of the over ground and underground Marmaray project is 76,7 km. The first part of project is the Bosphorus Crossing (BC1) with a length of 13,6 km. The BC1 project contains the construction of three bored tunnels and immersed tunnel under the Istanbul Strait. The construction studies in the tunnels and immersing tube were completed in the beginning of 2012. The planning and design of engineering projects are the main study focus of the engineering survey which is a basic requirement for many engineering projects. This paper explains the recent advances in engineering surveying operations, such as establishing the geodetic control network, deformation monitoring and as-built surveys, in the scope of BC1 project. The experiences gained during the measurement studies are presented as a guide for similar projects that will be realized in the future.

Tanım

Dergi veya Seri

TEHNICKI VJESNIK-TECHNICAL GAZETTE

ISSN

1330-3651

ISBN

Haklar

Alıntı

Koleksiyonlar

Onay

Gözden geçir

Tamamlayıcı Bilgiler

Referans Gösteren

Related Patent

Related Goal

0

Views

0

Downloads