Publication:
An Economic Model for the Revamping of a Pulverized Coal-fired Boiler

Loading...
Thumbnail Image

Date

Institution Authors

Item type:Person,

Advisor

item.page.editor

Editor

Department

Journal Title

Journal ISSN

Volume Title

Publisher

TAYLOR & FRANCIS INC

DOI

10.1080/15567249.2010.551826
View PlumX Details

Research Projects

Organizational Units

Journal Issue

Abstract

Equipping existing thermal power plants (TPPs) with newer technologies, such as fluidized bed combustion (FBC), is vital for many countries due to concerns about the economy, the environment, and energy policy. First, this study presents a general model for economic analysis of the revamping of a pulverized coal-fired boiler with FBC. Second, the developed model is applied to a 140 MW pulverized coal-fired TPP. Third, the payback period (PBP) is calculated by using the net present value (NPV) method. Finally, the effects of almost all technical and economic parameters, such as power loss, electricity price, and escalation rate are investigated on PBP and NPV. As a result, the outcomes of this study show that power loss has a significant effect on PBP and NPV.

Description

Journal or Series

ENERGY SOURCES PART B-ECONOMICS PLANNING AND POLICY

ISSN

1556-7249

ISBN

Rights

Citation

Collections

Endorsement

Review

Supplemented By

Referenced By

Related Patent

Related Goal

0

Views

0

Downloads