Yayın:
An Economic Model for the Revamping of a Pulverized Coal-fired Boiler

dc.contributor.authorCetin, B.
dc.contributor.institutionauthorÇETİN, Burhanettin
dc.date.accessioned2026-06-27T13:20:27Z
dc.date.issued2014
dc.description.abstractEquipping existing thermal power plants (TPPs) with newer technologies, such as fluidized bed combustion (FBC), is vital for many countries due to concerns about the economy, the environment, and energy policy. First, this study presents a general model for economic analysis of the revamping of a pulverized coal-fired boiler with FBC. Second, the developed model is applied to a 140 MW pulverized coal-fired TPP. Third, the payback period (PBP) is calculated by using the net present value (NPV) method. Finally, the effects of almost all technical and economic parameters, such as power loss, electricity price, and escalation rate are investigated on PBP and NPV. As a result, the outcomes of this study show that power loss has a significant effect on PBP and NPV.en
dc.description.sponsorshipScientific and Technological Research Council of Turkey
dc.description.sponsorshipTurkish Electricity Generation Co. Inc.
dc.description.urihttps://doi.org/10.1080/15567249.2010.551826
dc.identifier.doi10.1080/15567249.2010.551826
dc.identifier.eissn1556-7257
dc.identifier.endpage313
dc.identifier.issn1556-7249
dc.identifier.issue3
dc.identifier.startpage307
dc.identifier.urihttps://hdl.handle.net/20.500.14981/51964
dc.identifier.volume9
dc.identifier.wos000325678400011
dc.language.isoeng
dc.publisherTAYLOR & FRANCIS INC
dc.relation.ispartofENERGY SOURCES PART B-ECONOMICS PLANNING AND POLICY
dc.subjectboiler revamping
dc.subjecteconomic analysis
dc.subjectpayback period
dc.subjectthermal power plant
dc.subjectCOMBUSTION
dc.subjectEnergy & Fuels
dc.titleAn Economic Model for the Revamping of a Pulverized Coal-fired Boiler
dc.typeArticle
dspace.entity.typePublication
local.import.sourceWOS

Dosyalar

Koleksiyonlar