Yayın:
A two-stage stochastic model for workforce capacity requirement in shipbuilding

Yükleniyor...
Küçük Resim

Tarih

Kurum Yazarları

Danışman

item.page.editor

Editör

Bölüm / Program

Dergi Başlığı

Dergi ISSN

Cilt Başlığı

Yayıncı

TAYLOR & FRANCIS LTD

DOI

10.1080/20464177.2019.1704977

Türü

View PlumX Details

Araştırma Projeleri

Akademik Birimler

Dergi Sayısı

Özet

Studies have been being carried out to make production faster and more organised in the shipbuilding industry, as in other industry. The fact that automation-based works are limited in the shipbuilding industry is one of the biggest challenges encountered in block production as in other stages of shipbuilding. The blocks are time-consuming and difficult components to produce in the shipbuilding process. They are the structures formed by joining the cut metal sheets, profiles and other components. These activities are carried out at the different stations of shipyards. Labour planning is one of the crucial issues in shipbuilding. In this study, the allocation of the required capacity during the pre-production stations of the block production, namely C and D, is examined stochastically. The amount of work, revisions and worker performance under uncertainty factors to be experienced in the production process are included in the problem. A two-stage stochastic mathematical recourse model was established to determine the amount of workforce capacity requirement (man*day) of the planning period at the pre-production station depending on the factors. Scenarios are determined randomly and the near-optimum solution was tried to be obtained by the Sample Average Approximation (SAA) approach.

Tanım

Dergi veya Seri

JOURNAL OF MARINE ENGINEERING AND TECHNOLOGY

ISSN

2046-4177

ISBN

Alıntı

Koleksiyonlar

Onay

Gözden geçir

Tamamlayıcı Bilgiler

Referans Gösteren

Related Patent

Related Goal

0

Views

0

Downloads