Yayın:
A two-stage stochastic model for workforce capacity requirement in shipbuilding

dc.contributor.authorKafali, Mustafa
dc.contributor.authorAydin, Nezir
dc.contributor.authorGenc, Yusuf
dc.contributor.authorCelebi, Ugur Bugra
dc.date.accessioned2026-06-27T14:19:18Z
dc.date.issued2022
dc.description.abstractStudies have been being carried out to make production faster and more organised in the shipbuilding industry, as in other industry. The fact that automation-based works are limited in the shipbuilding industry is one of the biggest challenges encountered in block production as in other stages of shipbuilding. The blocks are time-consuming and difficult components to produce in the shipbuilding process. They are the structures formed by joining the cut metal sheets, profiles and other components. These activities are carried out at the different stations of shipyards. Labour planning is one of the crucial issues in shipbuilding. In this study, the allocation of the required capacity during the pre-production stations of the block production, namely C and D, is examined stochastically. The amount of work, revisions and worker performance under uncertainty factors to be experienced in the production process are included in the problem. A two-stage stochastic mathematical recourse model was established to determine the amount of workforce capacity requirement (man*day) of the planning period at the pre-production station depending on the factors. Scenarios are determined randomly and the near-optimum solution was tried to be obtained by the Sample Average Approximation (SAA) approach.en
dc.description.urihttps://doi.org/10.1080/20464177.2019.1704977
dc.identifier.doi10.1080/20464177.2019.1704977
dc.identifier.eissn2056-8487
dc.identifier.endpage158
dc.identifier.issn2046-4177
dc.identifier.issue3
dc.identifier.startpage146
dc.identifier.urihttps://hdl.handle.net/20.500.14981/59235
dc.identifier.volume21
dc.identifier.wos000503745400001
dc.language.isoeng
dc.publisherTAYLOR & FRANCIS LTD
dc.relation.ispartofJOURNAL OF MARINE ENGINEERING AND TECHNOLOGY
dc.rightsopenAccess
dc.subjectDESIGN
dc.subjectASSIGNMENT
dc.subjectSYSTEM
dc.subjectEngineering
dc.titleA two-stage stochastic model for workforce capacity requirement in shipbuilding
dc.typeArticle
dspace.entity.typePublication
local.import.sourceWOS

Dosyalar

Koleksiyonlar